After three years of major utility relocation and right of way acquisition, the Virginia Department of Transportation begins construction on the $110 million project to improve the congested Route 29 and Gallows Road intersection in Merrifield.Improvements to the intersection will increase safety, reduce congestion and enhance bicycle and pedestrian access, and include:
- Widening Route 29 from two to three through lanes in each direction between Merrilee Drive and I-495 (about 0.6 miles)
- Widening Gallows Road from two to three through lanes in each direction between Gatehouse Road and Prosperity Avenue (about 0.8 miles)
- On Route 29, a six-foot sidewalk on the westbound side and 5-foot sidewalk on the eastbound side
- On Gallows Road, a 10-foot asphalt shared-use path on the west side, and six-foot sidewalk on the east side
- Dual left-turn lanes on Route 29 at Gallows Road
- Landscaped medians on both approaches
Co Trails Plan |
Gallows Road is a major north-south connector for all modes of transportation, and a 10 foot shared-use path isn't sufficient to serve the pedestrian and bike traffic expected in this area. The 5 and 6 foot sidewalks along Route 29 are even worse. Given the late stage of this project, it's not very likely these plans will change. We plan to attend the meeting on Wednesday.
Update July 26—We've learned that wide outside lanes are included on Gallows Road. Bike lanes were proposed but they are not included in the final configuration. Wide outside or "wide curb" lanes work well for many cyclists although most people who are reluctant to ride in traffic would much prefer striped bike lanes. Bike lanes are currently striped on Gallows from the W&OD Trail to the bridge over I-66 just north of Dunn Loring Metro. Later this year bike lanes will be striped from the W&OD Trail north to Tysons.
No comments:
Post a Comment