Ribbon-cutting for Beltway bridge bike facilities

FABB members at Oak St Bridge
Today some FABB members rode to the Oak St. bridge over the Beltway to participate in a ribbon-cutting ceremony for the new bike facilities on that and many of the other 50 bridges that were rebuilt as part of the 495 Express Lanes project, formerly known as the HOT lanes.

The Oak St. bike lanes have been in place for some time but several of the other bridges are just now opening, including the new sidepaths on the Route 7, Westpark Dr, and Lee Hwy bridges. While many of the bike facilities are not ideal, in most cases this is the first time there has ever been a bike facility on those bridges. Starting in 2007 FABB fought hard to ensure some facilities were included in the project.

We initially planned to use the sidepaths on the Lee Hwy bridge, but the side paths were too narrow and aren't really a bike facility. Instead there are supposed to be wide curb lanes on that bridge and it wasn't safe to try to simulate a ribbon-cutting there. The outside lane isn't really wide; there is a painted stripe 3 feet from the curb making it an 11-foot lane with a 3 foot shoulder which isn't very useful for cyclists. I'd prefer to see the lane without the stripe.

After the ribbon-cutting we rode to the new Mosaic District (that I wrote about earlier) to attend the grand opening of Fresh Bikes. We met the manager Stacey and dropped off some FABB rack cards. It's a very nice shop, with many fine bike-oriented details including a bike chain used as edging on the front counter and bike chains used to support sections of the ceiling structure. We especially liked the automatic double-door entrance. We didn't see many transportation bikes; Fresh Bikes is a bike store for the "performance-minded." Some of their hybrids and cross bikes could be used for commuting. We wish them well and we hope to work with them in the future.

Mosaic District bike racks
Some of us then stopped at a nearby coffee shop for snacks and drinks. When we left we rode around the streets that are open and only saw one set of bike racks. They were nice racks that were like a U rack but with some style. There should be many more racks in place for visitors and we'll check no future plans for racks.

Finally, as we were leaving the development we decided to use Eskridge Rd to travel north where it turns into Merrilee Dr. We were in the straight through lane with no cars behind us and we waited through 2 full cycles before a car finally appeared. Under VA law we are allowed to go through the light after 2 cycles, but there should be a bicycle-sensitive sensor present. Traffic is so heavy on Lee Hwy that legally running the red light was not an option.

By the way, Eskridge Rd will soon be open south toward Route 50. That means that from Dunn Loring Metro station it will be possible to ride a route parallel to Gallows Rd all the way south to Woodburn Rd using Merrilee Dr to continue on Eskridge Rd to Williams Dr across Route 50 to Willow Oaks Corporate Dr to a new road that leads south past the Ronald McDonald House to Inova Hospital and on to Woodburn Rd.

Monday, 8 October 2012

"Walkable" Mosaic District not so bike-friendly

We've been hearing about the new Mosaic District development in Merrifield that is supposed to be transforming that area into a walkable community. See the Post article "Development transforming Merrifield into more walkable community." Only the first phase is complete, or nearing complete, so we'll hold off judgement about how walkable and bikeable the development is, but we did see what's in store for cyclists who want to ride to that area and it isn't pretty.

5-foot sidewalk on Lee Hwy at Gallows Rd
The county Trails Plan indicates that major paved trails 8 feet in width are planned for each side of Lee Highway adjacent to the development. What we found were 5 foot sidewalks on the south side and 6 foot sidewalks on the north side. There are no bike facilities on the road that has 10 lanes in some sections.

When this area was being planned several years ago there were suggestions from cyclists for bike lanes on Lee Highway. I can remember now-Planning Commissioner Earl Flanagan saying to me some time afterwards that those pesky bicyclists wanted too much and they didn't get bike lanes. We'll we didn't get a paved trail either. It looks like we're stuck with a narrow sidewalk on one side and a slightly less narrow sidewalk on the other side. All the more reason to make one of the travel lanes a bike lane by taking it when riding there; but only for the more experienced riders. Shouldn't we be encouraging more people to travel by bike to places like this?

To make things interesting, VDOT placed (or approved the placement) of a large pole holding traffic signals right in the middle of where a cyclist would enter the sidewalk on a curb ramp at one of the intersections (Yates Way?).

It's depressing to see what has happened in this area. To say this area in general is a walkable place is delusional. Pedestrians will take their lives in their hands trying to cross Lee Highway and Gallows Road. As you can see in the top photo, the right turn lane was designed for maximum speed for motorists and maximum danger for pedestrians. Conditions in the interior of the development should be much better for non-motorists, but they will likely need to drive to get there.

The only consolation is that these roads were planned many years ago. It seems that the county and VDOT do not have the flexibility to modify auto-dominated road plans in what should be walkable places. The roads can be re-engineered, but it's sad that they were built this way in the first place.

As a side note, when browsing the Mosaic District site we noticed that Fresh Bikes now has a shop located there. Maybe they can help make this location more bike-friendly.

Monday, 25 July 2011

VDOT meeting on Gallows Rd/Route 29 construction

VDOT rendering of the project
VDOT is holding a public meeting Wednesday night from 7-9pm at Luther Jackson Middle School to discuss the Gallows Road/Route 29 project that will include widening both Gallows Rd and Route 29. According to the Countywide Trails Plan, bike lanes are designated on Gallows Rd, with major paved trails (>8') on each side, and major paved trails are called for on each side of Route 29. That doesn't quite match what's being built:
After three years of major utility relocation and right of way acquisition, the Virginia Department of Transportation begins construction on the $110 million project to improve the congested Route 29 and Gallows Road intersection in Merrifield.Improvements to the intersection will increase safety, reduce congestion and enhance bicycle and pedestrian access, and include:
  • Widening Route 29 from two to three through lanes in each direction between Merrilee Drive and I-495 (about 0.6 miles)
  • Widening Gallows Road from two to three through lanes in each direction between Gatehouse Road and Prosperity Avenue (about 0.8 miles)
  • On Route 29, a six-foot sidewalk on the westbound side and 5-foot sidewalk on the eastbound side
  • On Gallows Road, a 10-foot asphalt shared-use path on the west side, and six-foot sidewalk on the east side
  • Dual left-turn lanes on Route 29 at Gallows Road
  • Landscaped medians on both approaches
Co Trails Plan
The meeting on Wednesday is a "pardon our dust" meeting. Public hearings for this project occurred several years ago after study by a task force, before FABB was formed. Around that time we recall being told by a member of the Transportation Advisory Commission, currently a Planning Commissioner, that "those bikers" wanted too much, despite the fact that the Trails Plan contained the above recommendations. Looks like we didn't get much either.

Gallows Road is a major north-south connector for all modes of transportation, and a 10 foot shared-use path isn't sufficient to serve the pedestrian and bike traffic expected in this area. The 5 and 6 foot sidewalks along Route 29 are even worse. Given the late stage of this project, it's not very likely these plans will change. We plan to attend the meeting on Wednesday.

Update July 26—We've learned that wide outside lanes are included on Gallows Road. Bike lanes were proposed but they are not included in the final configuration. Wide outside or "wide curb" lanes work well for many cyclists although most people who are reluctant to ride in traffic would much prefer striped bike lanes. Bike lanes are currently striped on Gallows from the W&OD Trail to the bridge over I-66 just north of Dunn Loring Metro. Later this year bike lanes will be striped from the W&OD Trail north to Tysons.