Showing posts with label annandale. Show all posts
Showing posts with label annandale. Show all posts

Thursday, 7 June 2012

South County public meeting summary

Annandale meeting participants
The final Bicycle Master Plan public meeting was held last night (Wed.) in Annandale. About 40 cyclists learned about the proposed bicycle network and other recommendations. Most people had attended other bike plan meetings.

During the meeting Cindy Engelhart, VDOT NoVA District bike coordinator, noted that that due to new legislation (see 15.2-2223, item B.4.), any changes to the county Transportation Plan must be approved by VDOT. This would delay approval of the plan since VDOT has 90 days to submit comments. The current goal is to have the bicycle plan approved by the end of this year.

An audience member asked about the possibility of a bond referendum to fund bike improvements. The answer was that some projects are being funded by the 2007 transportation bond and another transportation bond is planned. However, we think a bike-specific bond would be feasible. Why not ask residents if they would support a bike projects through a bond?

Results of the earlier survey were discussed. In a report of the Tuesday meeting we mentioned the top reason that people say keeps them from biking. The graph on the left shows the top six reasons. It was pointed out that the top 3 reasons, gaps in the bike network, barriers to travel, and continuous facilities don't exist for local trips, all relate to gaps in the system.

The top initiatives chosen by the meeting attendees were:
1. Form a countywide bicycle advisory committee.
2. Begin a trail maintenance program.
3. Focus attention on the VDOT resurfacing program.
4. Strengthen the existing bike program.
5. Launch a law enforcement initiative.
I think the most controversial recommendation is the treatment of what are referred to as "Big Roads." These are the major arterials such as Routes 1, 7, 50, 236, Braddock Road, etc. These are also the roads that create major barriers for most bicyclists. Most bike-friendly neighborhood streets don't connect to destinations. They feed into the big roads which have very few connected bike facilities. The off-road connections usually have many conflict points. Well-designed cycletracks are a good solution but are costly to implement and usually require additional right of way.

The recommendation for these roads is a table of possible treatments based on surrounding land use. Our concern is that unless the county holds to a strict policy of requiring the most appropriate facility, some developers may only implement the most low-cost solution. It could also be difficult to have a continuous, consistent design if there are options. There will likely be much discussion of this recommendation at the BAC meeting next week.

The next step in the process is for the Bicycle Plan Bicycle Advisory Committee to discuss the recommendations at our June 13 meeting. While the committee has previously seen most of the route network, the public meetings were the first chance to learn about the policy recommendations and the top initiatives. We'll need to discuss them at length, review the public meeting feedback, and develop a consensus.

Update: See the Fairfax City Patch article on the meeting, Cyclists Make Suggestions to Bike Master Plan.

Monday, 21 May 2012

Final Bicycle Master Plan meetings scheduled

Fairfax County just announced the final two countywide public meetings on the Bicycle Master Plan. The North County meeting is June 5 in Reston and the South County meeting is June 6 in Annandale. The final draft proposed route network will be presented along with policy and program recommendations.

This is the last opportunity to ensure that recommendations you made during the development of the plan are included in the route network or policy recommendations. The plan has been under development over the past year. Several FABB members are on the plan advisory committee and FABB was represented at all of the area meetings and the thematic meetings.

Please consider attending one of the following meetings:
North County Meeting
Tuesday, June 5, 6:30 - 8:30 p.m.
Reston Regional Library
11925 Bowman Towne Drive, Reston, VA 20190

South County Meeting
Wednesday, June 6, 6:00 - 8:30 p.m.
George Mason Regional Library
7001 Little River Turnpike, Annandale, VA 22003

Thursday, 16 February 2012

Annandale-Falls Church area bike plan meeting report

Last night cyclists from the Annandale and Falls Church area gathered at the Mason District office to hear about the countywide bicycle master plan. After a presentation by Bob Patten of Toole Design Group, cyclists marked up detailed maps of the area to highlight existing routes, popular destinations, and barriers to travel.

This was the sixth of eight meetings focused on different parts of the county. The Annandale-Falls Church bike plan area is located inside the Beltway south of I-66. There are several major barriers to bike travel: I-66 in the north, the Beltway, I-395, and Lake Barcroft. The bridges over the Beltway are being rebuilt as part of the HOT lanes project and many will have bicycle facilities, the roads leading to those bridges have few if any bike accommodations.

There was discussion of the lack of trail maintenance and the problem of identifying which agency or group is responsible for local trails. VDOT does maintain some paved trails in their right of way but the County is responsible for most, and there is almost no money available for repaving or repair. One way to find out who should maintain a specific trail you can contact the bike program office.

VDOT Snow Map
During the discussion, the VDOT NoVa district Bicycle and Pedestrian Coordinator Cindy Engelhart noted that the new VDOT snow map shows the location of all VDOT maintained roads. This is an interesting interactive mapping tool used to show the plowing status of all roads in Fairfax County that are maintained by VDOT. By hovering over the neighborhood icon all streets maintained by VDOT are highlighted according to their plowing status: Plowed, In Progress, Not Started (or No Event in black). Those streets not highlighted are maintained by others, either the county or homeowner associations.

An interesting statistic mentioned during the briefing is that most commuting trips (92,000) are greater than 3 miles in length (87%) but 34% of all other trips (272,000) are less than 3 miles, trips that with good bike facilities can easily be made by bike.

Marking up bike plan map
The Annandale area is not flat and one cyclist suggested showing elevation on bike route maps which can be valuable information for cyclists planning a trip. Currently Google Map bike directions does factor in elevation when calculating routes.

To see notes and information from the other bike plan meetings visit the bike plan Materials & Resources page.

After the bike plan meeting we held the monthly FABB meeting. One of our goals this year is to move the meeting location to different parts of the county. This was a good opportunity to do that, participate in the bike plan meeting, and meet some new cyclists.

FABB meeting
County bike coordinator Charlie Strunk reported that the contract for building bike lanes on Gallows Road from the W&OD trail north into Tysons to Old Courthouse Road was awarded. The project will be completed this year. The county bike route map is being updated and a draft of the map is currently being reviewed. Printed copies should be available by Bike to Work Day on May 18.

FABB member Douglas Stewart passed around a report assessing various bike routes between GMU and the Vienna Metro station. The next step is to work with the City of Fairfax to sign the route and make any needed improvements.

FABB is now a RoadID affiliate. If you visit the FABB homepage and click on the RoadID icon (or click on the icon on the left), 10% of any RoadID products you purchase within 60 days will be donated to FABB. We also have a new rack card. Thanks to TYTRAN, the Tysons transportation group with whom we're coordinating the Tysons Bike Group meetings, for helping us with the printing costs of the card.

Tuesday, 14 February 2012

Annandale Bike Plan and FABB Meetings tomorrow

This month FABB will move our monthly meeting to coincide with the Annandale Bike Plan Meeting. Both meetings will be held tomorrow, Wed. Feb. 15 at the Mason District Governmental Center, 6507 Columbia Pike, Annandale. The bike plan meeting is an open house that begins at 4:30 p.m. There will be a presentation at 6:00 p.m. The event is scheduled to end at 8:00 p.m. The FABB meeting will start at 7:30 p.m. in an adjacent room. Everyone is welcome to attend both meetings.

This is a good opportunity for cyclists to let the bike planners know where you ride, where you can't ride because of obstacles, and what the county can do to make the Annandale area more bike-freindly. There are many people who get around by bikes in this area. Many are service workers who rely on bikes for transportation. All cyclists in the area need better on- and off-road bike facilities, including adequate bike parking. School kids need safe ways to ride their bikes to school and places to park when they get there. They also need bike safety education classes. Let your voice be heard by attending this important meeting.